2022 Local Government Recovery Grant Program of Work Dungog Shire Council

Project NameProject DescriptionFunding Requested
Priority Projects
Shirewide road network surveyTechnical snapshot of current state of roads and road assets for pre-disaster evidence gathering and network resilience planning. Including in-house GoPro 360-degree hardware package.$200,000
Clarence Town Sporting Amenities Carpark Provision Provide sealed carpark for facility that doubles as a designated evacuation centre. $200,000
Doug Walters Pavilion Carpark Provision Provide sealed carpark for facility that doubles as the designated emergency operations centre $250,000
Coronation Park – repairs and drainage improvementsPlayground softfall repair due to damage from inundation and runoff. Scope includes subsurface drainage upgrade upstream of the softfall, and formalisation of the street drainage system immediately upstream of the playground, incl. kerb. $290,000
Clarence Town Village Green wetlands access paths repairPathways repair/reconstruction due to damage from the March 2022 event $20,000
Paterson – King Wharf Reserve repairsSeating and fences replacement due damage from March 2022 event$40,000
Sub-total$1,000,000
Extra Projects (in case of unsatisfactory alignment to Program criteria)
Paterson – John Tucker Park repairsRepair to soft fall of playground, access roads, seating and fence of oval due to damage from March 2022 event$120,000
Vacy – access to river restoration of gravel trackGravel access track repair due to damage from March 2022 event. Track to be upgraded with a stabilised riolite surface to resist frequent flood inundation.$25,000
Gresford – Orana Park repairsRepair to soft fall of playground, due to damage from March 2022 event$30,000
Dungog – Bruyn park repairs

Soft fall playground repairs

$25,000