³Ô¹ÏÍøÕ¾

Bangalow Road reopened: Ballina Shire

Bangalow Road reopened

Bangalow Road, between Moon Street and the Angels Beach Drive/Bangalow Road roundabout in Ballina has reopened to two-way traffic this afternoon.

At this stage one lane is open in each direction, with dual lanes to open in late June once line marking has been completed.

Works included stormwater renewal, street light installation, road widening and reconstruction to accommodate two lanes each way from Moon Street to the Angels Beach Drive/Bangalow Road Roundabout.

The pedestrian crossing refuge remains closed and pedestrians need to cross at the Kerr Street traffic lights.

Motorists are reminded that this section of Bangalow Road, near Moon Street, is still a 40kmph work zone. Please adhere to the speed limit and follow roadwork signage.

Intersection widening works are continuing on Bangalow Road north, between Kerr Street and the roundabout, where two-way traffic is being maintained.

Dual lanes will be constructed in this section and a new central concrete median. When these works are complete the Bangalow Road/Clark Street intersection will become left in/left out only (no right turn).

Council sincerely thanks local businesses and residents for their ongoing patience as these works are carried out.

For project information visit

/Public Release. View in full .