³Ô¹ÏÍøÕ¾

Cold Tea Creek bridge replacement

Lake Macquarie City Council

Artist's impression of the new bridge to be built over Cold Tea Creek.jpg

Work is underway on demolition of a pedestrian bridge over Cold Tea Creek at Belmont, with a landmark replacement bridge due to open in mid-2024.

Pedestrians won’t be able to cross Cold Tea Creek during the construction phase, except via the Pacific Highway bridge and path.

The new bridge will form part of the Fernleigh Awabakal Shared Track, a 3.5km shared path linking the existing Fernleigh Track at Belmont to Awabakal Avenue at Blacksmiths.

It will feature a teardrop-shaped aesthetic, reflecting the Awabakal Dreamtime story about how nearby Belmont Lagoon was created.

Go to

/Public Release. View in full .