Vista Gold Corp. (NYSE American and TSX: VGZ) (“Vista” or the “Company”) today announced interim results from Phase 2 of its 2024 drilling program at the Company’s Mt Todd gold project (“Mt Todd” or the “Project”) located in Northern Territory, Australia. Phase 2 drilling commenced in July 2024 with near-surface drilling in the South Cross Lode zone (the “SXL”), a known mineralized structure with high-grade intercepts that intersects the Batman deposit and extends up to 400 meters northeast.
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240923441188/en/
Figure 1: Plan view of the Mt Todd as-built terrain showing Phase 2 drill hole locations with respective orientation to date. (Graphic: Business Wire)
Drill Hole Highlights